FIRE PROTECTION SYSTEM 

Atlantic 360

Project Overview

Site: 25 apatments 1 rest.
Levels: 7
Total area: 5.000 m2

CLIENT

Particular

LOCATION

Aruba

YEAR

2017

CONTRACT

Fire protection for all areas of the building according to NFPA and Aruba Fire Department

bhhs-logo.png
1. ENGINEERING
Design and issue of engineering construction drawings AND “As Built “drawings.


2. SUPPLY
Panel and devices, automatic Sprinkler, Hose Cabinets, and a Diesel Fire Pump systems, portable fire extinguishers, LED Emergency Lights and illuminated EXIT signs, ABC multipurpose and CO2

3. INSTALLATION.
Pipes, electricity, water installment.

4. ACEPTANCE TEST
Pre-commissioning, commissioning and acceptance test activities.
 

5. DATA BOOK
Project Engineering Data Book and O&M Manual.

6. TRAINING
Operational training of the Hotel Boutique Airport personnel.


7. ASSISTANCE
Assistance to owner to obtain approval certification of Aruba Fire Dept 

NORMS and JURISDICTION 

NFPA 3, 2015
NFPA 4,  2015 Commissioning of Fire Protection and Life Safety Systems. 
NFPA 70 2011 National Electrical Code. 
NFPA 4, 2015. Integrated Fire Protection and Life Safety System.
NFPA 10, 2018 Portable Extinguishers.
NFPA 13, 2016 Installation of Sprinkler System.
NFPA 14, 2016 Installation of Standpipe and Hose System.
NFPA 20, 2016 Installation of Stationary Pumps for Fire Protection.
NFPA 22, 2013 Water Tanks for Private Fire Protection. 
NFPA 72, 2016 National Fire Alarm and Signaling Code.
NFPA 101, 2018 Life Safety Code.
NFPA 730: 2014 Guide for premises security. 
NFPA 731: 2015 installation of electronic premises security systems 
International Building Code 2009.
International Fire Code 2009. 

 AB 1991 no. 10 Fire Department Aruba. 