top of page

FIRE PROTECTION SYSTEM

AZURE Towers A and B

Project Overview

Site: 8 town houses 2 level each Club House Pool and Gardens
Total area: 17.000 m2

CLIENT

Particular

LOCATION

Aruba

YEAR

2018

CONTRACT

Fire Alarm System, Fire Sprinkler System, Emergency Lighting System, Fire Extinguishers.

bhhs-logo.png
1. ENGINEERING
Design and issue of engineering construction drawings AND “As Built “drawings.


2. SUPPLY
Panel and devices, automatic Sprinkler, Smoke sensors detectors, manual pull stations devices,
alarm notification appliances, horn and sounder bases, visual notification strobes lights, cables and initiating, notification and control devices, piping, accessories, floor control station, fire department
connections, extinguishers, emergency lights, EXIT signs.


3. INSTALLATION.
Pipes, electricity, water installment.


4. ACEPTANCE TEST
Pre-commissioning, commissioning and acceptance test activities.
 

5. DATA BOOK
Project Engineering Data Book and O&M Manual.

6. TRAINING
Operational training of Azure personnel.


7. ASSISTANCE
Assistance to owner to obtain approval certification of Aruba Fire Dept 

SYSTEMS INSTALLED 

Fire Alarm System
Fire Sprinkler System
Emergency Lighting System for common areas and apartments
Fire Extinguishers
atlantic.png

Our fire prevention solutions are designed to meet the diverse needs

 Our dedication to innovation and customer satisfaction sets us apart as the preferred partner for businesses seeking reliable fire prevention solutions.

bottom of page