1. Design and issue of engineering construction drawings AND “As Built “drawings.
2. Purchase of all materials and equipment included shipping and handling for all systems.
3 Pipes, electricity, water installment.
4. Pre-commissioning, commissioning and acceptance test activities.
5. Project Engineering Data Book and O&M Manual.
6. Operational training of the Hotel Boutique Airport personnel.
7. Assistance to owner to obtain approval certification of Aruba Fire Dept
SYSTEMS INSTALLED:
- Fire Alarm System.
- Emergency lighting.
- Fire Pump System.
- Automatic Sprinklers system.
- Manual Intervention, Hose connections, Portable Fire Extinguisher CO2 and dry chemical.
- Wet standpipe, with auxiliary connection for fire department.
NORMS and JURISDICTION
NFPA 3, 2015
NFPA 4, 2015 Commissioning of Fire Protection and Life Safety Systems.
NFPA 70 2011 National Electrical Code.
NFPA 4, 2015. Integrated Fire Protection and Life Safety System. NFPA 10, 2018 Portable Extinguishers.
NFPA 13, 2016 Installation of Sprinkler System.
NFPA 14, 2016 Installation of Standpipe and Hose System.
NFPA 20, 2016 Installation of Stationary Pumps for Fire Protection.
NFPA 22, 2013 Water Tanks for Private Fire Protection.
NFPA 72, 2016 National Fire Alarm and Signaling Code. NFPA 101, 2018 Life Safety Code.
NFPA 730: 2014 Guide for premises security.
NFPA 731: 2015 installation of electronic premises security systems International Building Code 2009. International Fire Code 2009.
AB 1991 no. 10 Fire Department Aruba.

Our fire prevention solutions are designed to meet the diverse needs
Our dedication to innovation and customer satisfaction sets us apart as the preferred partner for businesses seeking reliable fire prevention solutions.